It is possible to enable the display of the Parent Tasks panel in the view of a child document. To do this, from the document type of the child document, you must enable it in the document panels section using the following button:
Then, if the document has parent documents, the panel is displayed in the document. Within it, the tasks for each existing parent document are shown, allowing open tasks to be completed directly from the panel:
In addition to managing open tasks, it is also possible to view all tasks associated with those documents:
Add the Parent Tasks switch if it does not appear in the panel configuration
If the Parent Tasks parameter does not appear in the panel configuration, it must be added manually. To do this, you must have access to the administration.
In the form, click the button to navigate to the administration of that form.
In the Allow panels field, include the following parameter in the list:
{"name": "parent_workflows", "label": "Parent Tasks", "state": true}